Hybrid metaheuristics for solving a fuzzy single batch-processing machine scheduling problem.

This paper deals with a problem of minimizing total weighted tardiness of jobs in a real-world single batch-processing machine (SBPM) scheduling in the presence of fuzzy due date. In this paper, first a fuzzy mixed integer linear programming model is developed. Then, due to the complexity of the pro...

Descripción completa

Detalles Bibliográficos
Publicado en:Scientific World Journal pp. 214615 - 214616
Autores principales: Molla-Alizadeh-Zavardehi, S, Tavakkoli-Moghaddam, R, Lotfi, F Hosseinzadeh
Formato: Journal Article
Publicado: Wiley-Blackwell 2014
Acceso en línea:Ver este registro en EBSCOhost
fields @attributes:
  recordID: 1
pdfLink:
plink: https://search.ebscohost.com/login.aspx?direct=true&db=ccm&AN=103826027&site=ehost-live
header:
  @attributes:
    shortDbName: ccm
    uiTerm: 103826027
    longDbName: CINAHL Complete
    uiTag: AN
  controlInfo:
    bkinfo:
    dissinfo:
    jinfo:
      jid:
        1537744X
        1BX5
      jtl: Scientific World Journal
      issn: 1537744X
      maglogo: N
    pubinfo:
      dt: 2014
      pid: 480
      pub: Wiley-Blackwell
      place: Malden, Massachusetts
    artinfo:
      ui:
        103826027
        NLM24883359
        2012601863
        10.1155/2014/214615
        NLM24883359
        PMC4030488
        103826027
      ppf: 214615
      ppct: 1
      formats:
      tig:
        atl: Hybrid metaheuristics for solving a fuzzy single batch-processing machine scheduling problem.
      aug:
        au:
          Molla-Alizadeh-Zavardehi, S
          Tavakkoli-Moghaddam, R
          Lotfi, F Hosseinzadeh
        affil: Department of Industrial Engineering, Science and Research Branch, Islamic Azad University, Tehran, Iran.
      sug:
        subj:
          Logic
          Personnel Staffing and Scheduling
          Systems Analysis
          Algorithms
          Artificial Intelligence
          Models, Theoretical
      ab: This paper deals with a problem of minimizing total weighted tardiness of jobs in a real-world single batch-processing machine (SBPM) scheduling in the presence of fuzzy due date. In this paper, first a fuzzy mixed integer linear programming model is developed. Then, due to the complexity of the problem, which is NP-hard, we design two hybrid metaheuristics called GA-VNS and VNS-SA applying the advantages of genetic algorithm (GA), variable neighborhood search (VNS), and simulated annealing (SA) frameworks. Besides, we propose three fuzzy earliest due date heuristics to solve the given problem. Through computational experiments with several random test problems, a robust calibration is applied on the parameters. Finally, computational results on different-scale test problems are presented to compare the proposed algorithms.
      pubtype: Academic Journal
      doctype: Journal Article
      ougenre: Article
    language: English
    refInfo:
    holdings:
      @attributes:
        islocal: N