Production practices affecting worker task demands in concrete operations: A case study.

BACKGROUND: Construction work involves significant physical, mental, and temporal task demands. Excessive task demands can have negative consequences for safety, errors and production. OBJECTIVE: This exploratory study investigates the magnitude and sources of task demands on a concrete operation, a...

Descripción completa

Detalles Bibliográficos
Publicado en:Work Vol. 53; no. 3; pp. 535 - 551
Autores principales: Memarian, Babak, Mitropoulos, Panagiotis
Formato: case study pictorial research tables/charts Journal Article
Publicado: Sage Publications Inc. 2016
Acceso en línea:Ver este registro en EBSCOhost
fields @attributes:
  recordID: 1
pdfLink:
plink: https://search.ebscohost.com/login.aspx?direct=true&db=ccm&AN=113828383&site=ehost-live
header:
  @attributes:
    shortDbName: ccm
    uiTerm: 113828383
    longDbName: CINAHL Complete
    uiTag: AN
  controlInfo:
    bkinfo:
    dissinfo:
    jinfo:
      jid:
        10519815
        3RC
      jtl: Work
      issn: 10519815
      maglogo: N
    pubinfo:
      dt: 2016
      vid: 53
      iid: 3
      pid: 344
      pub: Sage Publications Inc.
      place: Thousand Oaks, California
    artinfo:
      ui:
        113828383
        113828383
        113828383
        10.3233/WOR-152179
        113828383
      ppf: 535
      ppct: 16
      formats:
        fmt:
          @attributes:
            type: P
      tig:
        atl: Production practices affecting worker task demands in concrete operations: A case study.
      aug:
        au:
          Memarian, Babak
          Mitropoulos, Panagiotis
        affil: Exposure Control Technologies Research, CPWR - The Center for Construction Research & Training, Silver Spring, MD, USA
      sug:
        subj:
          Task Performance and Analysis
          Construction Industry United States
          Job Performance
          Clinical Assessment Tools
          United States
          Occupational Safety
          Human
          Absenteeism
          Frustration
          Teamwork
      ab: BACKGROUND: Construction work involves significant physical, mental, and temporal task demands. Excessive task demands can have negative consequences for safety, errors and production. OBJECTIVE: This exploratory study investigates the magnitude and sources of task demands on a concrete operation, and examines the effect of the production practices on the workers' task demands. METHODS: The NASA Task Load Index was used to measure the perceived task demands of two work crews. The operation involved the construction of a cast-in-place concrete building under high schedule pressures. Interviews with each crew member were used to identify the main sources of the perceived demands. Extensive field observations and interviews with the supervisors and crews identified the production practices. RESULTS: The workers perceived different level of task demands depending on their role. The production practices influenced the task demands in two ways: (1) practices related to work organization, task design, resource management, and crew management mitigated the task demands; and (2) other practices related to work planning and crew management increased the crew's ability to cope with and adapt to high task demands. CONCLUSIONS: The findings identify production practices that regulate the workers' task demands. The effect of task demands on performance is mitigated by the ability to cope with high demands.
      pubtype: Academic Journal
      doctype:
        case study
        pictorial
        research
        tables/charts
        Journal Article
      ougenre: Article
    language: English
    refInfo:
    holdings:
      @attributes:
        islocal: N