A dynamic sequential decision-making model on MRI real-time scheduling with simulation-based optimization.

Magnetic resonance imaging (MRI) is widely used in diagnostic medicine and contributes significantly to US health care spending. Scheduling MRI jobs involves uncertainties (e.g., patient arrival time, scanning time, and preparation time) that can lead to excessive delays and high costs in MRI operat...

Descripción completa

Detalles Bibliográficos
Publicado en:Health Care Management Science Vol. 25; no. 3; pp. 426 - 441
Autores principales: Pang, Bowen, Xie, Xiaolei, Ju, Feng, Pipe, James
Formato: Journal Article
Publicado: Springer Nature Sep2022
Acceso en línea:Ver este registro en EBSCOhost
fields @attributes:
  recordID: 1
pdfLink:
plink: https://search.ebscohost.com/login.aspx?direct=true&db=ccm&AN=159102803&site=ehost-live
header:
  @attributes:
    shortDbName: ccm
    uiTerm: 159102803
    longDbName: CINAHL Complete
    uiTag: AN
  controlInfo:
    bkinfo:
    dissinfo:
    jinfo:
      jid:
        13869620
        BSE
      jtl: Health Care Management Science
      issn: 13869620
      maglogo: N
    pubinfo:
      dt: Sep2022
      vid: 25
      iid: 3
      pid: 237
      pub: Springer Nature
      place: New York, New York
    artinfo:
      ui:
        159102803
        159102803
        NLM35426049
        10.1007/s10729-022-09592-6
        NLM35426049
        159102803
      ppf: 426
      ppct: 15
      formats:
      tig:
        atl: A dynamic sequential decision-making model on MRI real-time scheduling with simulation-based optimization.
      aug:
        au:
          Pang, Bowen
          Xie, Xiaolei
          Ju, Feng
          Pipe, James
        affil: Department of Industrial Engineering, Tsinghua University, Beijing, China
      sug:
        subj:
          Organizational Efficiency
          Appointments and Schedules
          Magnetic Resonance Imaging
          Academic Medical Centers
          Computer Simulation
          Job Descriptive Index
          Ferrans and Powers Quality of Life Index
      ab: Magnetic resonance imaging (MRI) is widely used in diagnostic medicine and contributes significantly to US health care spending. Scheduling MRI jobs involves uncertainties (e.g., patient arrival time, scanning time, and preparation time) that can lead to excessive delays and high costs in MRI operations. This study addresses real-time decision making in use of MRI scanners based on job assignment and sequencing decisions that override the appointment schedule. The decisions are made using real-time information of the waiting patients, the utilization status of the MRI scanners, and the partially revealed uncertainties of scanning times of current patients. A sequential decision-making framework and a simulation-based solution method are proposed to utilize massive real-time information and match the use of MRI rescheduling in practice. The results are then compared with a real case in a large midwestern academic medical center in the US. This study illustrates that the proposed method reduces patient waiting time by 21.7% and improves utilization of MRI scanners by 23.0%. An optimality gap of 13.6% is provided when compared to off line scheduling methods based on a mixed integer programming (MIP) model. The number of simulation replications in this approach uses the ranking and selection method, which not only reduces solution time, but also provides solution quality guarantees wherein the probability of errors in the proposed method for one day is less than 0.1%. In 100 randomly generated workday experiments, all of the scheduling decisions given by the proposed method perform better than current policy, with an average reduction of 17.93 minutes in each patient's waiting time and an improvement of scanner utilization by 7.20%.
      pubtype: Academic Journal
      doctype: Journal Article
      ougenre: Article
    language: English
    refInfo:
    holdings:
      @attributes:
        islocal: N