The benefits of collaboration on display at Westmark Tower: AluK helped save months from the build schedule of a 29-storey, curved-inplan tower by working closely with the architect, developer and other consultants throughout.
| Publicado en: | RIBA Journal Vol. 129; no. 1; pp. 30 - 32 |
|---|---|
| Formato: | Artículo |
| Publicado: |
RIBA Enterprises Ltd
Jan2022
|
| Materias: | |
| Acceso en línea: | Ver este registro en EBSCOhost |
| fields | @attributes: recordID: 1 pdfLink: plink: https://search.ebscohost.com/login.aspx?direct=true&db=hlh&AN=163502912&site=ehost-live header: @attributes: shortDbName: hlh uiTerm: 163502912 longDbName: Humanities International Complete uiTag: AN controlInfo: bkinfo: jinfo: jid: 14639505 B0Y jtl: RIBA Journal issn: 14639505 maglogo: N pubinfo: dt: Jan2022 vid: 129 iid: 1 pid: 25377 pub: RIBA Enterprises Ltd artinfo: ui: 163502912 ppf: 30 ppct: 2 formats: tig: atl: The benefits of collaboration on display at Westmark Tower: AluK helped save months from the build schedule of a 29-storey, curved-inplan tower by working closely with the architect, developer and other consultants throughout. aug: su: Towers Architects Curtain walls Consultants Structural frames Structural engineering sug: subj: Towers Architects Curtain walls Consultants Structural frames Structural engineering pubtype: Trade Publication doctype: Article src: R ab: language: English refInfo: copyright: @attributes: flag: Y dt: @attributes: year: 2022 holdings: @attributes: islocal: N |
|---|