Flood area and damage estimation in Zhejiang, China.
A GIS-based method to estimate flood area and damage is presented in this paper, which is oriented to developing countries like China, where labor is readily available for GIS data collecting, and tools such as, HEC-GeoRAS might not be readily available. At present local authorities in developing co...
| Published in: | Journal of Environmental Management Vol. 66; no. 1; pp. 1 - 9 |
|---|---|
| Main Authors: | , |
| Format: | Article |
| Published: |
Academic Press Inc.
September 2002
|
| Subjects: | |
| Online Access: | View this record in EBSCOhost |
| fields | @attributes: recordID: 1 pdfLink: plink: https://search.ebscohost.com/login.aspx?direct=true&db=ssf&AN=506335776&site=ehost-live header: @attributes: shortDbName: ssf uiTerm: 506335776 longDbName: Social Sciences Full Text (H.W. Wilson) uiTag: AN controlInfo: bkinfo: jinfo: jid: 03014797 EMJ jtl: Journal of Environmental Management issn: 03014797 maglogo: N pubinfo: dt: September 2002 vid: 66 iid: 1 pid: 735 pub: Academic Press Inc. artinfo: ui: 506335776 10.1006/jema.2002.0544 ppf: 1 ppct: 8 formats: tig: atl: Flood area and damage estimation in Zhejiang, China. aug: au: Renyi, Liu Nan, Liu su: Geographic information systems Environmental management Floods China sug: subj: China Geographic information systems Environmental management Floods ab: A GIS-based method to estimate flood area and damage is presented in this paper, which is oriented to developing countries like China, where labor is readily available for GIS data collecting, and tools such as, HEC-GeoRAS might not be readily available. At present local authorities in developing countries are often not predisposed to pay for commercial GIS platforms. To calculate flood area, two cases, non-source flood and source flood, are distinguished and a seed-spread algorithm suitable for source-flooding is described. The flood damage estimation is calculated in raster format by overlaying the flood area range with thematic maps and relating this to other socioeconomic data. Several measures used to improve the geometric accuracy and computing efficiency are presented. The management issues related to the application of this method, including the cost-effectiveness of approximate method in practice and supplementing two technical lines (self-programming and adopting commercial GIS software) to each other, are also discussed. The applications show that this approach has practical significance to flood fighting and control in developing countries like China. Copyright 2002 Elsevier Science Ltd. All rights reserved. pubtype: Academic Journal doctype: Article src: R language: English refInfo: copyright: @attributes: flag: N holdings: @attributes: islocal: N |
|---|