SNAPSHOT.
The Los Angeles Clippers will be moving into their new $1.8 billion Intuit Arena in Inglewood for the upcoming 2024-25 season. The arena, designed by AECOM and engineer Walter P Moore, features a seismically isolated, structural-steel diagrid frame covered in ETFE and PTFE panels to protect against...
| Publicado en: | Architectural Record Vol. 212; no. 7; pp. 108 - 109 |
|---|---|
| Autor principal: | |
| Formato: | Artículo |
| Publicado: |
BNP Media
Jul2024
|
| Materias: | |
| Acceso en línea: | Ver este registro en EBSCOhost |
| Sumario: | The Los Angeles Clippers will be moving into their new $1.8 billion Intuit Arena in Inglewood for the upcoming 2024-25 season. The arena, designed by AECOM and engineer Walter P Moore, features a seismically isolated, structural-steel diagrid frame covered in ETFE and PTFE panels to protect against rain and direct sun exposure while allowing for fresh air. The 18,000-seat arena is fully electrified and aims to be operationally carbon-neutral from its opening in October, thanks to solar panels and battery storage. The arena also includes a three-acre outdoor space called the Intuit Dome Plaza with basketball courts and a screening area. |
|---|